More information on Food, Retail & Services
Standard hours for food trucks in:
Creative Quarter: 11am - 3pm
The Hexagon: 11am - 3pm
Building 500: 8 - 11am
Find out more about Curtin’s food, retail and other services around campus.
Properties, Facilities & Development
Curtin has developed a number of guiding documents that provide instructional information for those providing design based services.
These documents cover a range of topics from overarching master planning frameworks, through to development guidelines and technical guides for specific plant and equipment.
Drivers For Change.
pdf 4.25MB
Master Plan.
pdf 9.22MB
Delivering The Vision.
pdf 8.32MB
This document summarises information contained in the Greater Curtin Master Plan Parts A, B and C, the Academic Heart Development Guidelines and the Living Knowledge Stream Design Guideline.
As this map brings together information contained in different documents, we acknowledge there may be missing or conflicting information – it should therefore be used for reference purposes only to help inform planning decisions and subsequent investigation / assessment will be necessary.
Download and open the file in Adobe Acrobat and select View Layers. This will open a window where layers of information can be turned on or off.
These documents cover key planning controls applicable to Planning and Project delivery for Curtin University Projects.
Academic Heart Development Guidelines (PDF 10MB)
Integrated Transport and Movement Plan (PDF 3MB)
Curtin Wayfinding Strategy (PDF 1MB)
Disability Access and Inclusion Plan
↳ Universal Design Guideline – Built Form (PDF 2.3MB)
These documents cover key technical requirements applicable to the delivery of Curtin University Projects.
To provide you an overview of the Project Delivery Guidelines document suite, we ask all users to please read the following document first:
Using the Project Delivery Guidelines (PDF 0.9MB)
When updating any Project Delivery Guidelines please use the dependency matrix guide to identify other guidelines that might also require updating.
PDG Dependency Matrix Guide (XLSX 0.2MB)
Workplace Guidelines (PDF 0.4MB)
Learning and Teaching Spaces Guidelines (PDF 0.5MB)
Green Star – Communities Design Guidelines (PDF 0.8MB)
Emergency Management Design Guidelines (PDF 563KB)
Living Knowledge Stream Design Guideline (PDF 4.3MB)
Curtin Circuit Guidelines (PDF 4MB)
Documentation Deliverables Guidelines (PDF 1.1MB)
Furniture, Fixtures and Equipment Guidelines (v2) (PDF 447KB)
Signage Planning Design Guidelines (PDF 382KB)
Find the below listed health and safety documents on Curtin’s Health and Safety website under Contractor Management.
Acoustic Requirements Guidelines (v2) (PDF 546KB)
Change Log – Acoustic Requirements Guidelines (v2) (PDF 537KB)
Assets Assessment Framework (v3.4) (PDF 1MB)
Condition Assessment Guideline – Buildings (v2.3) (PDF 1MB)
Condition Assessment Guideline – Inground (v2.3) (PDF 602KB)
Condition Assessment Guideline – Public Places (v2.3) (PDF 1MB)
Data Management Plan (v1.2) (PDF 769KB)
Audiovisual Guidelines – Master Guide (PDF 588KB)
Campus Logistics Guidelines (PDF 256KB)
Buildability and Maintainability Guideline (PDF 346KB)
Data Communications Cabling Requirements (v4) (PDF 588KB)
Electrical Services Guidelines (v5) (PDF 1MB)
Fire Safety Project Guidelines (PDF 1MB)
Hazardous Materials Project Guidelines (v2) (PDF 439KB)
Hazardous Materials Storage Guidelines (PDF 523KB)
Hydraulic Services Design Guidelines (v3) (PDF 671KB)
Vertical Transport Guidelines (PDF 470KB)
Mechanical Services Guidelines (v5) (PDF 2MB)
Public Places Design and Technical Guidelines (v5) (PDF 411KB)
Security Infrastructure Design Guidelines (v4) (PDF 2MB)
Services Metering Guidelines (v5) (PDF 319KB)
These documents cover key technical and interface requirements applicable to the delivery of external developer led projects on Curtin University property.